Rasuwa After the flood swept away the bridge and road of Syafrabensi, traffic was blocked, and the locals of the northern part of Rasuwa have engaged in the construction of a temporary bridge through public donations. The bridge is being constructed from October 25th with the joint participation of local residents and security agencies of Amachhodingmo Rural Municipality