Kathmandu. Learning from the recent devastating floods, the road department is going to change the standards and design of bridge and road infrastructure construction. Now construction of long span and high bridges without pillars in the middle of the river
"Now a long bridge without pillars should be built in the middle of the river"
Kathmandu. Learning from the recent devastating floods, the road department is going to change the standards and design of bridge and road infrastructure construction. Now construction of long span and high bridges without pillars in the middle of the river
This article is an original report researched, verified, and produced by the Nepali Samachar editorial desk. We adhere to independent reporting standards and ethical, fact-checked journalism.
Related Stories
More in Culture →
Tourist destinations to visit in Eastern Nepal during Dashain
1 October, Thirteenth. With the arrival of Dashain, the excitement of the festival has started to increase in the villages. The activity of shoppers in the market has increased and they are taking advantage of the long holidays to spend time with their families and relatives. Dashain is limited to family gatherings and fun…
Dasain before and after marriage
No matter where people are throughout the year, no matter what their situation is, when Dasain comes, the mind automatically returns to home. Dasai is also a festival to bring distant relatives closer. Dasain is a festival to get blessings along with red tika and yellow jamara decorated on the forehead
Economics of Dussehra: To increase spending only or domestic production too?
Badadasin has entered the courtyard of Nepali people. The public holiday has started from the seventh day of this festival i.e. Phoolpati which lasts for 15 days (till the full moon). It seems that there is an increase in shopping, activities and fairs in the market. The government is also targeting Dasai
